So sorry to hear about this, and hope you can get help resolving with the scheduler or project manager.
These shops seem to sit unclaimed near me even when bonused and I almost scheduled one last week. The low fee barely covers the gas to get there, but I like the pizza too.
Maybe this is why no one wants to do them.
If it’s a hassle to get reimbursed the food cost by handing in a report that I have to argue about after doing the work, I’ll pass.
Thanks for the heads-up, and hope you can get a fair solution to a fix-able problem.