Most recently, I completed an 8-room office in ~ 90 minutes. I did not time it, but I remember when I entered and noticed when I left. The most time-consuming tasks are opening all the packets of brochures and pulling/culling from multiple boxes so that there are enough of each type for all offices. (Some packets contain two to three times the number of brochures as others and can fill more slots.) There two tiny tasks take more time than emptying racks, filling them, and obtaining the required images.
I wonder if tptb would consider sending the materials to me so that I could spend time at home prepping everything and reduce my time on-site. Mind you, I usually have one office per month, which is not high volume. But my back would be so happy! I could wear my heels and reach the top slots without being on tiptoe and risking an outbreak of Morton's Neuroma! I would be there for such a short time, leave with happy back, and possibly fit in more gigs each day! But one per day is not very many units. Hmm.....
@Gracen247 wrote:
I’ve made two appointments. My first location had 11 racks. The office had me come right when they closed thinking I would be there for about 20 minutes addding brochures. The paperwork says 2-5 minutes per room. I had to remove all the old materials, unpack and add the new materials, manage the trash. How long has it taken some of you to complete a rack? Thanks!
Nature does not hurry, yet everything is accomplished. - Lao-Tzu
Edited 1 time(s). Last edit at 05/02/2021 03:18PM by Shop-et-al.