On January 2, 2015, I added all my gas station shops for MaritzCx on my Google calendar and planned out my entire schedule for the month of January. I also printed put the "List of Outstanding Shops for XYZ Gas Stations - Site Inspection P1, 2015" directly from their website. The list shows pertinent information including shop fee, compensation (aka bonus), product purchase limit and due date which includes the actual date range to perform the shops.
Four of my gas station shops are now showing totally different due dates. Two of them for January 10th and two of them for January 17th. My original due dates were January 24th so I had already planned out my month accordingly. When I noticed these date changes less than an hour ago, I first checked my hard copy master printout list from their website. All four of the shops have a January 24th due date.
So I get on the phone with someone from Team 3 and of course, she was very nice but didn't have a clue as to what had happened or why the due dates were changed without even contacting me. Thank God I happened to notice the changed due dates or I would have been screwed. Has anyone else had this happen to them?
P.S. The Team 3 member (who is not 80-something years old) said that the dates could not be changed in the system and I do not have any availability left to do anymore shops by the January 10th deadline. The only thing she could do was remove them from my shop log and I would have to reapply/self-assign them myself. Weird, huh?
Four of my gas station shops are now showing totally different due dates. Two of them for January 10th and two of them for January 17th. My original due dates were January 24th so I had already planned out my month accordingly. When I noticed these date changes less than an hour ago, I first checked my hard copy master printout list from their website. All four of the shops have a January 24th due date.
So I get on the phone with someone from Team 3 and of course, she was very nice but didn't have a clue as to what had happened or why the due dates were changed without even contacting me. Thank God I happened to notice the changed due dates or I would have been screwed. Has anyone else had this happen to them?
P.S. The Team 3 member (who is not 80-something years old) said that the dates could not be changed in the system and I do not have any availability left to do anymore shops by the January 10th deadline. The only thing she could do was remove them from my shop log and I would have to reapply/self-assign them myself. Weird, huh?